15.0 RATES, FEES AND CHARGES

15.1 RATE SCHEDULE NO. 1 ­ FEES AND SPECIAL CHARGES ­ NON RECURRING


Rule

Service

Fee or Charge

4.2/4.7/5.2

Water turn-on/turn-off (per visit)
During business hours $ 69.00
During non-business hours $176.00

4.3/4.7/12.3

Return visit necessitated by restricted access or failure to show for scheduled appointment $ 36.00
$ 36.00

6.2

Fees for water service connections installed by AWU. This charge includes permit and inspection fees Cost of Installation
1 inch $824.00 Deposit
1-1/2 inch $925.00 Deposit
2 inch $1,102.00 Deposit
Larger than 2 inch through the first valve Deposit determined by AWWU General Manager

5.3

Temporary off-site construction service hydrant meter deposit. Meter deposits are chargeable for each meter provided.
Per vehicle for tanker trucks
Per site specific hydrant for non vehicle projects
1 inch meter $129.00 Deposit
2 inch meter $516.00 Deposit
3 inch meter $975.00 Deposit

Permits

5.3

Temporary off-site construction service annual permit
Per vehicle for tanker trucks
Per site for non vehicle projects
$48.00
$48.00

6.1.A

Permit Administration Fee $48.00

Inspections

4.11/6.1.C

Fee to inspect a service connection or a service extension. (The fee is per a service connection or a service extension.)
3/4 inch to and including 2 inch (all lengths) $57.00
3 inches and up Cost of Inspection
$372 Deposit

6.6

Extended water service connections (up to 200 feet) Cost of Inspection
$372 Deposit

Other Charges

11.4.B

Late payment fee (on past due balances) $1.00

12.3

Reconnection or restoral charge $175.00

4.7/11.3.C/12.2A

Unauthorized turn-on/turn-off $138.00

11.5

Non-Sufficient Fund Charge $ 25.00

7.5

Meter test Cost of Test
3/4 inch through 2 inch meters $162.00 Deposit
Meters larger than 2 inch $162.00 Deposit

4.5

Water service for test purposes $138.00

4.8

Duplicate locate service
During business hours
During non-business hours
 
$ 44.00
$112.00

6.4/6.5

Water Plan Review Fees for Private Systems:
Small Private System Project.

Large Private System Project
$361.00

$852.00
Relinquish Easements $360.00

13.4

Special Assessment Collection Charge

Annual administrative fee for each active special assessment account. $ 67.00

5.10.B

Cross Connection Control Program
Annual/monthly administrative fee for each active backflow preventer assembly.

$ 15.00/annual or
$  1.25/mo.

13.3

Levy Upon Connection (LUC) water assessment rates. Following are the LUC rates for years:
1971 and prior
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
$ .08000
$ .09093
$ .11973
$ .07849
$ .13565
$ .22743
$ .24611
$ .26368
$ .19419
$ .10279
$ .36222
$ .12343
$ .13121
$ .29245
$ .16050
$ .16178
$ .42901
$ .22727
$ .30094
$ .24782
$ .33707
$ .34530
$ .46969
$ .49425
$ .63353
$ .64284
$ .66941
$ .87616
$ .85182
$ .88661
$ .92564
$1.01818
$1.07490
$1.02721
$ .98347
$ .92197
$ .86376
$ .79895