South
Chugiak Water & Sewer Improvements
The Route Assessment and Project Prioritization Report
(CRW / October 2003) prioritized the
South Chugiak Water and Sewer Improvements higher than the North Chugiak Water
Improvements and the Peters Creek Water Improvements. Additionally, the
South Chugiak Water and Sewer Improvement were further prioritized into
project segments, which are depicted in the figures included on this page
and discussed below. The
existing funds will allow complete construction of the following
project segments:
- Gravity Sewer Trunk Extension (Priority 1). This project will
extend the existing gravity sewer main on the Old Glenn Highway from
Raeleen Street to just north of Monastery Drive.
- Sanitary Sewer Force Main Trunk (Priority 2). This project will
include a sanitary sewer lift station and force main on South Birchwood
Loop Road and the Old Glenn Highway from Chugiak High School and connect to the
previously discussed Gravity Sewer Trunk Extension (Priority 1).
- Anchorage School District (ASD) On-Property Sewer Improvements
(Priority 3). This project will convert the on-site sewer leach-fields
that serve Chugiak High School and Birchwood Elementary School to a piped system
that will connect to the previously discussed Sanitary Sewer Force Main
Trunk (Priority 2) and Gravity Sewer Trunk Extension (Priority 1).
- South Water Main Extension (Priority 4). This project will
extend the existing water main on the Old Glenn Highway from south end of
Lower Fire Lake north to East Lake Ridge Road.
- North Water Main Extension (Priority 5). This project will
extend the South Water Main Extension on the Old Glenn Highway north to
South Birchwood Loop Road, then west on South Birchwood Loop Road to the
Existing Water Transmission Vault near Chugiak High School.
AWWU anticipates securing adequate funds to complete construction of the
sewer segments (Priority Segments 1, 2, & 3) in 2008/2009 to provide piped
sewer service to Chugiak High School and Birchwood Elementary School.
At this time funding for the water segments (Priority Segments 4 & 5) is not
currently planned since all proposed Water Improvement Districts failed to
be formed by the community..