Schedule


Design Study:
Complete
Surveying:
Complete
Design:
65% Design Draft submitted and on hold pending additional field work.
Existing Pipe Condition Assessment:
Ongoing. Two isolation valves were installed in May 2010 and a physical condition assessment of the existing 2 inch water distribution pipe was conducted. Recommendations from this investigation are forthcoming and will establish the future time line of this project.
Public Involvement:
A newsletter update will be issued upon completion of the foregoing pipe condition assessment.
Construction:
Estimated 2011 or later.